I painted and installed the retaining walls that connect the upper and lower levels. To the left of the short wall, I’ll build, paint, and install the remaining retaining wall for the grade sometime in the near future. I was also able to cover the newly created elevated section with some basic ground cover. I only created this area to break up all of the flatness. Plus, I wanted to get rid of the odd pieces of Homasote I had hanging around . Thanks for looking.
Andy