Skip to main content

Reply to "What did you do on your layout today?"

Jim, those are Menards double track bridges. I was originally going to do a double track bridge in the back and a single track bridge in the front. Then I decided to get another double track bridge for the front. Two tracks will run through the back bridge while only one track will run through the front one. What I planned to do is run a plank roadway in the bridge next to the single track for trucks hauling coal. The three tracks coming to the bridges come from under the stairs. Starting at the back that track is a yard lead to the front of the basement, the track next to it is the mailine and the track closest to the front is a spur coming from a future coal operation which also comes from the front of the basement which will allow for pull through coal loading of the hopper cars. Going toward the back of the basement will be a freight yard, numerous industrial sidings and a small engine facility..........Paul

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×