geysergazer posted:Track plan tweaks, that's what.
I went from:
This
To this, dropping one stub siding.
Upon examination I decided to move the runaround track leftward to a much more natural position immediately beside the mainline thus creating a proper passing siding appearance. Of course I had to move the paint factory and shorten what had been the runaround into a stub spur. A more railroad-like trackplan with no loss of operation potential. I like it.
Lew
Very nice Lew I like it