Skip to main content

Reply to "What did you do on your layout today?"

Lee- similar to Andy's technique I ran my road (thin corrugated cardboard) up to the rail edge. The gap across the rails is 1/16" balsa. Filled the gaps with gravel and ground cover.

Granted I'm not doing anything as complex as the LIRR Main Line- Oyster Bay Branch Interlocking

Bob

2017-12-28 16.49.372018-03-25 08.34.152018-03-25 08.34.26

Or just run gravel right to the rail for a different look.

2018-09-01 08.13.13

Bob

Attachments

Images (4)
  • 2017-12-28 16.49.37
  • 2018-03-25 08.34.15
  • 2018-03-25 08.34.26
  • 2018-09-01 08.13.13

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×