Skip to main content

Reply to "What did you do on your layout today?"

On the second day with my new building I began by properly finishing reinstalling 14 feet of fence.   I swept the building and made careful measurements.  I established the main board height at 30 inches.  I finally get to use my laser level!  I attached a full length 2x4 to 3 walls and a forth board four feet from the back wall.  I found a piece of plywood just for a picture.  I will clear my original 4x8 setup and cut it to 4x7' 3".  I'm still looking at track plans as a starting point.

One thing is bothering me early on.  I think I want to turn the building 90 degrees.  This would fix a problem with water running off one building on to the porch the other.   By time I gave out, I was working by the light of a kerosene lamp.  I put an engine and caboose in the building to make it all official.  Track soon.DSC03115DSC03122

Attachments

Images (2)
  • DSC03115
  • DSC03122

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×