For the final run on my existing lay out, here is a load of fuel rods for your nuclear power plant. The 4501 gets a little scary over 45 mph so we should be there about Monday. Could you have some coal available?
The Bald Rock Mountain Railroad move has progressed to the point that it's time to pull up track. I'll have the elevated section down tonight. I will be out of the bedroom on schedule. More tomorrow.