Skip to main content

Reply to "What did you do on your layout today?"

Well, another Saturday with Patrick is in the books. While he did another section of skirting, I was making more wires for the uncoupler project, and putting track diagrams on the fascia.

As you can see, short skirts are in this year.

IMG_8874IMG_8875

The new track diagram for the Ford Plant. It was a bit of a squeeze to get 8 tracks onto the fascia.

IMG_8873

Patrick, the man behind the magic, wires the bolts to the electronics module.

IMG_8872

After doing two small diagrams for Roseville, I forgot to look behind the fascia, to make sure the area was clear for the bolts. The bottom hole was fine, but the top one hit a mounting block for a Tortoise., Oops.

IMG_8876

Patrick nearly panicked, but just I took the chuck key and moved the drill bit out as far as I could, and kept going, til it popped out the back side of the block. You can just see the tip of the bit, sticking out on the left side. I'll just have to hit Menards for a 5" bolt. Seat of the pants engineering at work!

IMG_8877

Attachments

Images (6)
  • IMG_8874
  • IMG_8875
  • IMG_8873
  • IMG_8872
  • IMG_8876
  • IMG_8877

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×