Last night I ran 3 trains simultaneously on the layout, a local passenger trains pulled by a camelback locomotive, a train comprised of gondolas with junk loads with an SW9 on the point, and a train of of pulpwood cars pulled by a 44 tonner. Also running on the industrial spur was an 0-8-0 on a switching assignment. All the while a trolley kept time going back and forth on the elevated trestle.
|