On Track one: a PRR mixed freight headed up by a trio of geeps.
On track two: Penn Central freight with GG1 power
On track three this C&O U23B leads the way.
Track four: a trio of WM geeps rolls past the yet to be completed grade crossing improvements. Boy, those guys work slow !
-RM