Skip to main content

Reply to "What what are the top 3 items on your 2 rail wish list?"

@GG1 4877 posted:

No advance deposits would be required for Sunset, just enough pre-orders to cover a run of 350-500 models total in 2 rail and 3 rail in all roads.  The challenge is the same as it is for steam though in that there is market perception that smaller means less cost when the cost of design, tooling, fabrication, and construction is the same.  The savings in material costs is almost zero.

You can tell folks that over and again, but it simply does not seem to sink in.

So folks need to pick one that is the overwhelming popular and go for it.  If you don't try, it's just another bit of wishful thinking.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×