Still trying to get built my 3 level layout. When finished someday it will have 3 separate tracks for 3 trains & a separate track for a trolley. All conventional operation. Track 1 will only be on level 1, Track 2 will run on both levels 1 & 2 & use same section of track area for incline/decline, speed will be controlled by use of a MTH PS2 locomotive. Track 3 will run on level 2 only and the trolley will run on level 3 only. I have been derailed from working on it lately due to rotator cuff surgery in Dec 2014 & right knee scope done 3 days ago for 2 meniscus tears in the right knee. Had left knee scoped for meniscus tears Jan 2014. Physical Therapy & doing the excercises at home have been keeping me too busy. All my curves are O-31 Realtrax or Fastrack O-36 so no need for the high tech stuff for me as it's a small layout but it's all the space I got for it.
|