Okay, I'm not explaining myself very well.
Simple layout that is powered by a 180W powerhouse for running Lionchief locos only.
Switches controlled by Ipad via Wifi module. An ASC2 to control switches and an STM2 to monitor switch positions.
Reading the ASC2 manual seems to say the currently offered switches won't work.
Thanks