Skip to main content

Reply to "Winter Tinplate running with COVID rules in place."

Following the basic social distancing COVID rules has made it very tough for running trains.  I had to tear out my dual track mainline and replace it with a single track because I didn't have room to space the tracks 6 feet apart.  It was the same situation with positioning cars on the yard tracks - the way my yard is built I can only put 4 cars in it - two spaced 6 feet apart on the far track and two on the near track. And I can only keep one engine in the roundhouse ...oh well, at least I can still run trains...

I think I have a fix for the yard situation.  Prohibit brakemen from being on the tops of cars.  Use a diesel with one man on the ground to pass signals and uncouple cars.  IT won't be very efficient, but you can handle more cars.   :-)

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×