@Tom Tee posted:A long while ago while very busy I had an 0 scale sub contractor wire a client's layout for me. He was using a typical Bernzomatic torch with the safety defeated so he would get a flame with just a click. Well, he was zipping along, solder in his mouth, wire stripper on one hand, torch in the other and wrapped up a medium sized layout connections in less than an afternoon.
How's he doing on his treatments for lead poisoning?