Woods Warehouse Craftsman Kit Build – Post 4

I installed the planked exterior siding on all four walls and also on the loading doors. The siding took me about nine hours.

Provision is being made for interior lighting to be added after the model is finished. The large front and rear loading doors will be movable so that LEDs can be installed through the opened doors, the wires passed through the nearby openings in the floor, and the doors then repositioned. This involves installing framing to provide tracks for the loading doors. The attached photos show the siding, loading doors and some of the door track framing. Construction time to date about sixteen hours.

Next steps will be:

1) Paint the exterior walls gray

2) Paint and install brick foundation

3) Paint and weather loading dock wood, build loading dock

MELGAR

MELGAR_2019_1203_WAREHOUSE_020_SIDING_COMPLETEMELGAR_2019_1203_WAREHOUSE_021_SIDING_COMPLETEMELGAR_2019_1203_WAREHOUSE_023_FRONT_LOADING_DOORMELGAR_2019_1204_WAREHOUSE_025_DOOR_FRAMES_FRONT_VIEWMELGAR_2019_1204_WAREHOUSE_026_DOOR_FRAMES_REAR_VIEW

Attachments

Images (5)
  • MELGAR_2019_1203_WAREHOUSE_020_SIDING_COMPLETE
  • MELGAR_2019_1203_WAREHOUSE_021_SIDING_COMPLETE
  • MELGAR_2019_1203_WAREHOUSE_023_FRONT_LOADING_DOOR
  • MELGAR_2019_1204_WAREHOUSE_025_DOOR_FRAMES_FRONT_VIEW
  • MELGAR_2019_1204_WAREHOUSE_026_DOOR_FRAMES_REAR_VIEW