Not too much done this past weekend - life and family obligations.
I did drill the holes to mount the alignment pins and dowels for the liftout (not all the holes on the right side were actually used) and inserted the metal receivers and pins. I also painted and turfed the wedge and stained the long board that runs through the closets to match the knotty pine.
Also, trimmed, re-installed and filled in the luan edging board that I had removed at the wedge.
The wire, connectors and terminals came in from Del City and I ordered some more quarrystone paper tile to put on the wall behind the wedge.
Hopefully, I'll get more done this week.