Skip to main content

Reply to "Wye and Reversing Loop Extension - Final Update"

Got the liftout itself completed. Once everything is up and running, I'll go back and install luan edging or veneer strips along the edges of the wedge and liftout for a finished look.

Next step is to complete the fit-up of the 10' long oak board running through the closets. I'll glue down the special FT foam roadbed and solder all the 30" FT straights together to insure no loss of continuity in the closets and screw the track to the board in a few places. I'll also install some plastic clamps underneath the board to carry all the wiring to the other end of the playroom for the reversing loop and accessories.

I'll then disconnect the FT trackpins where shown and start the wiring.

EXTENSION - COMPLETED LIFTOUTEXTENSION - LIFTOUT WITH TRACKAGEEXTENSION - LIFTOUT WITH PINSEXTENSION - LIFTOUT SHOWING CUTS_LI

Attachments

Images (4)
  • EXTENSION - COMPLETED LIFTOUT
  • EXTENSION - LIFTOUT WITH TRACKAGE
  • EXTENSION - LIFTOUT WITH PINS
  • EXTENSION - LIFTOUT SHOWING CUTS_LI

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×