I want to add a consist storage area starting out with one strait lead off my lower main line transitioning into four 150 inch storage tracks. I want them to be parallel and as close to each other as possible. I want 0-72 curves. I use Fastrak. Can any of you experts post a track plan for me? I am tired of building a consist every time I run trains. It would be nice to just couple up and pull. Thanks Nick
Original Post