I got to the builders studio about 11:30 so that I could lend a hand in breaking apart the layout. By 12:45 the movers arrived and backed their trunk into the building.
Let the games begin.
One by one each section was loaded into the truck any wrapped with a moving blanket.
The last one was loaded into the truck about 2:10.
Thirty minutes later we arrive at my house and the movers start unloading and staging the modules in the basement.
I could't resist taking some birds-eye pictures.
Will post the installation/setup pictures later.