Skip to main content

Reply to "Yes, I am a Looper ** New Video 6/14/23 **"

Time to show some structures, I will post wiring pictures over the weekend.

This is the Central Valley double-track Heavy Duty Truss Bridge.  This was built from a kit and will be mildly weathered before final installation.   The bridge will cross over the double track main line, just as the lower tracks are crossing over a river.  This scene will be one of three major focal points.  Many more details (besides the weathering) will be added before delivery.

Next is the early stages of a small (Veteran's Park) scene that will be near the center of a small town shopping and entertainment area.

The lumber yard / building supply business is the only industry with a service spur.

Different angle.

Custom made signage at the entry point.

 

 

 

 

Attachments

Images (5)
  • mceclip0
  • mceclip0
  • mceclip1
  • mceclip1
  • mceclip2
Last edited by SantaFeJim

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×