Time to show some structures, I will post wiring pictures over the weekend.
This is the Central Valley double-track Heavy Duty Truss Bridge. This was built from a kit and will be mildly weathered before final installation. The bridge will cross over the double track main line, just as the lower tracks are crossing over a river. This scene will be one of three major focal points. Many more details (besides the weathering) will be added before delivery.
Next is the early stages of a small (Veteran's Park) scene that will be near the center of a small town shopping and entertainment area.
The lumber yard / building supply business is the only industry with a service spur.
Different angle.
Custom made signage at the entry point.