Originally Posted by TrainHead:
What are the pro and cons comparing both of these systems? I know with the Power Master you would need a TPC , Cab1L, and a power master controller. I believe all of these things are built into the ZW-L??
Is one system more costlier than the other? I need a through comparison of both systems. Thanks.
Maybe you should state the environment and solicit recommendations. Now knowing the problem, it makes it pretty difficult to suggest a solution.