Skip to main content

William 1 posted:

Good luck.  I hope you build it.

Thanks William, that is the plan, I have the money and approval from the wife.   Still need to talk to a contractor, make sure I have all my easements accounted for (look again at the property plat), check with the city, check with the home owners association.   And another think about my health/mobility - Am I really up to building a layout of this size?   I am getting better with occasional set-backs (yesterday was a bad day - today feels great!).   So construction next year gives me more time to be sure I can handle this project.   I am building my 4x10 Nickle Plate Road layout as a test of my capabilities- making progress on that small layout.

And make a final decision on the "micro" restroom.   I am looking at the possibility of creating a paved walkway beneath the deck at the back of the house, to run to a restroom on the other end (which serves the pool/hot-tub and as a changing room).  Just an alternative, I still favor the "micro" restroom in the layout building.

Consider thinking down the road.  The RR is built.   The mainline is up and running,  in a flat circle.

Then the creative juices start reflowing, "how about a twice around over under mainline".  Too late at that point, but not too late now.

Maybe consider revamping the basic R.O.W. to mix up the mainline.  Running mainline trains over and under with up and down grades adds considerable visual interest.  Especially with a dual main line.

In my experience, we all like to incorporate a variety  of available sidings for potential switching operations but activity frequently boils down to running trains.  

Working along the premise that when you cannot exceed the length and width, go up and down; I offer a suggestion:  As you construct the benchwork, allow an unencumbered structural provision to keep twelve inches clear directly under the platform to possibly add a subway system down the road.  Lionel  and MTH have some real nice subway trains.

Note black painted subway level.

IMG_0931

Attachments

Images (2)
  • IMG_0931
  • IMG_0931

Pulling back the tunnels below Wolf Creek to reveal the 3rd inside main.  Better?

M1424A_V3f2

I am also experimenting with an idea:  I like the concept of elevating the double-track mainline, as the prototype does, with more roadbed and ballast.   Track running in the yard and through towns is at a lower level, closer to the layout surface.   So I thought about elevating the 3rd/inside main a bit above the table surface by 1/8".   That sounds like a small amount, but will be discernable to the eye when viewing the layout within about 3' or so.   The effect in the illustration that I have posted is small, but you can see it when you click on the illustration to zoom it (on my large monitor) on the 3rd/inside main on the right side and through Three Forks.

So I will have three levels of tracks (not counting the grade up to Wolf Creek and Cascade), starting at 0" in towns and the yard, where the tall Altas track is laid directly on top of the vinyl grassmat and ballasted.   Then an additional 1/8" of elevation for the inside/3rd main, then ballasted.   Then 1/2" of elevation beneath the Atlas track for the double-track mains.   There will be small grades to reach these levels, at 1%.   And three different colors of ballast - pretty light gray for the double-mains, down to the yard and towns at a darker gray.  I did the left side 3rd/inside main and around Deer Lodge as well.   All three mains will be at 0" elevation through Helena Yard due to the cross-over connections to the yard.

I often see real mainline roadbed/ballast in a staggered elevation of two levels, roadbed and subroadbed, with perhaps different slopes to the ballast for the two levels and different colors (lighter for the newer ballast at the top).   Whether by design/intent or a result of reconditioning the ballast periodically as part of maintenance.

Attachments

Images (1)
  • M1424A_V3f2
Last edited by Ken-Oscale

I love the design!  Does your software have the ability to create a 3D rendering, to illustrate the vertical separation between mainlines?  The only true "over & under" is the NS interchange on the right side, correct?  And you're gaining 7" of vertical separation in about 20 feet, right?

Thanks so much for sharing your excellent design and thought process.  Pretty soon we'll look forward to seeing pictures of the real thing!!

DoubleDAZ posted:

Ken, does the software capture the video? I wish SCARM did that?

Hey Dave.   To create these video recordings, I develop the layout in AnyRail.   Then export the layout to a file understandable by TrainPlayer (math behind the track as a spreadsheet), and export a pic of the layout.   Then import the layout math and pic into TrainPlayer, place trains on the track, get the trains moving.   Then, while TrainPlayer does its thing, I use MS Powerpoint to create a screen recording (no control over frame rate and such).   If I had a mic capturing the sound output from TrainPlayer, the recording would capture that as well (I just didn't bother with that this time).   I would like a higher frame rate, but of course the file would get larger, and the forum limits a post to 100MB, which is about 2min+ of these recordings at the set frame rate.

Last edited by Ken-Oscale
Ted S posted:

I love the design!  Does your software have the ability to create a 3D rendering, to illustrate the vertical separation between mainlines?  The only true "over & under" is the NS interchange on the right side, correct?  And you're gaining 7" of vertical separation in about 20 feet, right?

Thanks so much for sharing your excellent design and thought process.  Pretty soon we'll look forward to seeing pictures of the real thing!!

Thank you Ted!   AnyRail does a 3D rendering, but its not really that good, so I rarely use it, but sometimes.   The only real grade is as you observe, on the BNSF climing at the top and over the right side and across the long bridge to Cascade.

The grade climbs 9" in 24 feet (about 3%, the precise 3% would be 9" over 25').   I use the approximation of Woodland Scenics inclines, which is based on inches climbed in 8', or 96", which is close to 100 inches.   So Woodland Scenics is off a bit on the math, but then easier to use based on 8', 4', 2' etc, much more convenient and practical.

SantaFeJim posted:

Love It....  

 

That is just too cool.  I can't help but notice that it has attracted a good audience.  

Is the software smart enough to hide the train as it enters the tunnels?

 

Jim, TrainPlayer will recognize tunnels, check the recording I inserted at the top of this thread.   For a better recording, I would need to align the track section joints with the tunnel portals (which would mean revising the layout with flex track and creating joints under the tunnels - more work than I want at the moment).   Even if I do that work, still the cars disappear and reappear as a whole, "winking-in" and out of the layout, rather than a gradual transition.   Perhaps there is a way to break track in TrainPlayer advanced versions, I am just using the basic edition of the SW.   Too bad this effect is not better.   Even so, it is fun to be able to see trains run the layout.   

In TrainPlayer, you can run individual trains under control, throw switches, couple and uncouple, blow the horn/whistle, import loco specific sound files, and set trains to run automated routes.   

Last edited by Ken-Oscale
Tom Tee posted:

Consider thinking down the road.  The RR is built.   The mainline is up and running,  in a flat circle.

Then the creative juices start reflowing, "how about a twice around over under mainline".  Too late at that point, but not too late now.

Maybe consider revamping the basic R.O.W. to mix up the mainline.  Running mainline trains over and under with up and down grades adds considerable visual interest.  Especially with a dual main line.

In my experience, we all like to incorporate a variety  of available sidings for potential switching operations but activity frequently boils down to running trains.  

Working along the premise that when you cannot exceed the length and width, go up and down; I offer a suggestion:  As you construct the benchwork, allow an unencumbered structural provision to keep twelve inches clear directly under the platform to possibly add a subway system down the road.  Lionel  and MTH have some real nice subway trains.

Note black painted subway level.

IMG_0931

Ted, you make good points.   Perhaps there is room to have the two mains change elevations and swap positions.   I started with the idea of a double-track main, I really like that.   But you make a valid point, perhaps giving up that design goal to have more vertical "play" would be worth it in the long run.  [somewhat more difficult construction - I have been trying to do an easy to build design.]   Perhaps I could have the 3rd/Inside branchlines climb or descend - I will think some about that idea.

"In my experience, we all like to incorporate a variety  of available sidings for potential switching operations but activity frequently boils down to running trains."   True for me!   Perhaps this layout will be different, with the operating plan, switching, a small yard, etc.

Subway - that is an idea.   I had considered that perhaps a future expansion would be some kind of under the table layout, as you suggest, but my thinking has not gone far down that path.   If I set the layout height at 48", then an under the table subway would be easy to view.   I am not a big fan of subways, however.

I had looked a bit at adding an elevated On30 layout (which I have done on a number of other plans), rather than something more below the layout.  Perhaps interchanging at Cascade.   I haven't found a good way to do this yet.

Thanks! - Ken

Last edited by Ken-Oscale

Some thinking about getting more elevation "play" into a basically flat layout (with some small elevations of mainlines, and the BNSF to Cascade grade).   A limitation is the viewing area in front, I don't want to block that clear view across the layout, so that rules-out a number of ideas.  And I need clearance to scoot under the tables to the access areas in the two corners (upper left, and under Wolf Creek). 

So I have this idea to get more elevation changes, without actually much change to the layout track plan.   I want construction to be simple on flat tables, not complex like Tom's pic above.     But, its no big deal to lay sheets of 1" thick foam, or 2" thick foam, and use Woodland Scenics inclines and risers, on top of a flat table of 2" foam 4x8 sheets.   So with 0" elevation as the lowest level at 42" actual height, I have the yard at 1" and tracks descend to the towns in both directions.   The double-track mains climb at 2% to 2" increase to 3" in height.   The BNSF to Cascade is unchanged, except starting at 1" and reaching its apex at 10".

So in front of the viewing area, the double-mains are at 3" above the table surface (45" from the floor), and the towns themselves are at 0" (42" from the floor).   An interesting view, so the eyes have things to look at level, below, and above to the mountains.   And then across the room to the yard/engine service at 1" and the BNSF branch climbing to the right.  Anyway, what do you think?  Scenic detailing not yet done for the changes.

M1424A_V4a

Also exploring the possibility of an On30 above the UP staging track/mountain.

Attachments

Images (1)
  • M1424A_V4a
Last edited by Ken-Oscale
Ken-Oscale posted:
SantaFeJim posted:

Love It....  

 

That is just too cool.  I can't help but notice that it has attracted a good audience.  

Is the software smart enough to hide the train as it enters the tunnels?

 

Jim, TrainPlayer will recognize tunnels, check the recording I inserted at the top of this thread.   For a better recording, I would need to align the track section joints with the tunnel portals (which would mean revising the layout with flex track and creating joints under the tunnels - more work than I want at the moment).   Even if I do that work, still the cars disappear and reappear as a whole, "winking-in" and out of the layout, rather than a gradual transition.   Perhaps there is a way to break track in TrainPlayer advanced versions, I am just using the basic edition of the SW.   Too bad this effect is not better.   Even so, it is fun to be able to see trains run the layout.   

In TrainPlayer, you can run individual trains under control, throw switches, couple and uncouple, blow the horn/whistle, import loco specific sound files, and set trains to run automated routes.   

Ken, I watched your with the “tunnel effect” and now I understand why you did not use that feature in your last video.  It really distracts from the overall viewing experience.

Having said that, I have another question.  Can you expand the viewing window to include the lower right hand corner of your layout?

FYI, this is quickly becoming my all time favorite thread on the OGR Forum.  Thank you and Keep up the great work.

 

 

 

Ken, I did some research after I posted my question and figured out that you exported the design for TrainPlayer and I found references to PowerPoint, but couldn’t tell if you used that or if TrainPlayer did the video directly.  I have an older version of PowerPoint that doesn’t have the capture option. I’m not sure if it’s worth upgrading just for that. Thanks for the information.

"In my experience, we all like to incorporate a variety  of available sidings for potential switching operations but activity frequently boils down to running trains. "

Very interesting. My experience has come to be just the opposite. The more varied and interesting I make switching operations the less absorbing I find looping trains to be. By now the only thing that loops on the Plywood Empire Route is the Royal Gorge because that is when I reminisce about riding  trains.

It truly is a matter of different strokes for different folks, isn't it?

Lew 

So, working on the idea of doing more at elevation:   a try at adding an On30 loop and route.   Yes, just a circle, for continuous running, but perhaps a back-and-forth could be worked out.   Bachmann On30.   I might think of this as an "operating accessory" that adds, motion, color, and more trains to see.   I am not yet convinced, but am interested.

M1424A_V4b

Attachments

Images (1)
  • M1424A_V4b
Last edited by Ken-Oscale

I am thinking about this On30 idea, invest in an automation system, so the train backs out of the siding in the lower left, runs the circle twice, heads across the bridge and along the ridge, then back to the circle, around twice, and into the siding.   Press a button and the sequence starts, and then repeats after a delay interval.  Cool?

M1424A_V4b2

Attachments

Images (1)
  • M1424A_V4b2
Last edited by Ken-Oscale

A bit more work refining the On30 "operating accessory" on the left.   A back and forth run, with a short train staged on the siding, or perhaps two short trains taking turns, under automation.

M1424A_V4c

I looked at using a "Y" rather than a circle at the lower left.   Not quite enough room for the "Y" legs, unfortunately.

Attachments

Images (1)
  • M1424A_V4c
Last edited by Ken-Oscale
Mark Boyce posted:

It's a great looking plan, for sure!  Have you had any more thoughts on the building it will go in?

Thanks Mark.   Still working on my health and retirement, so decision time is "on hold".  Unfortunately .   Well, retirement finances are fine, I wanted to last another year or two (I'm 62), but then my activity ability is not strong enough yet - getting better at a snail's pace.

Last edited by Ken-Oscale
Mark Boyce posted:

I’m sorry to learn that, Ken!  Get yourself well.  Everyone has been telling me to take my knee replacement recovery slowly.  The older we get, the more we have to take care of ourselves.

Yeah, I have heard that knee replacement is "not too bad", but then my sister and father-in-law had a time with it, long recovery.   If my sister can get well, I have promised her and her husband a trip out to Denver by rail, then ride the rails up the "front range" to the hot-springs resort town of Glenwood Springs.   A fantastic train ride!  Mountains, Colorado River.   Good motivation for her to get healed from the first knee, and then do the second.   Hoping she will be 100% by August of 2020.

Last edited by Ken-Oscale

I liked this plan and followed its development closely.  When Ken published his 14' x 24' plan it intrigued me as being a candidate for the redesign of my current layout.  But my room is 24' x 28'.  How often does one have more space than what's required? 

I feel that the best use of the 4 feet is to increase the length of the yard.  An obvious use of the 4 feet.  I tried to enter Ken design into SCARM.  He used sectional track plus a couple pf pieces of flex.  I don't know what his max diameter curves were, but his minimum curve is O72.  All mainline switches were #5s.  He did have one O72/O54 curved switch which I eliminated.  My mainlines are O99/O108 the rest is O81 and O72.

If I adopt this plan, I will have to reflect this right to left.  I have my access door 6 feet from the lower right.

JanKen v2

Attachments

Images (1)
  • Ken v2
Files (1)

I don't know how plausible this would be, but what if, to get some more over/under action, you extended the BNSF extension in front of the doorway (using a removable bridge), and then had it go down and reconnect just after the roundhouse turn? This would require going with the bathroom-less option and probably losing Deer Lodge and the On30. Basically, it's turning the BNSF Connection into the third main and making Three Forks the out-and-return switching short line. Just a suggestion. And please post any progress you've made over the quarantine!

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×