Skip to main content

Replies sorted oldest to newest

Recently bought about 15-20 pieces of new 10-inch straights, mixed that together with some used track that I've accumulated (some of which still has paint on it from the layout it was ripped out of). Hooked up to a transformer in ONE location (not one drop for every section of track). Literally took me longer to remove the rolling stock from boxes than it took me to lay down the track. Transition from tile to carpet and carpet to tile, no problem. Maybe if I had a $3000 steamer it would be more picky about the track, but this Weaver runs just fine. By the way, the only other Weaver piece is the Mobilgas tanker at the end, everything else is Atlas.

I hate that people have the impression of 2-rail being finicky and hard to deal with. My 4-year old and I had no problems!

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×