Skip to main content

Replies sorted oldest to newest

Thanks for posting. That is an impressive railroad. I'm interested in the Bragdon geodesic foam scenery he used to cover the large layout areas. I hope the owner has better luck with the reliability of the AtlasO turnouts than I have had. I now jump all the rail segments for positive connectivity, insert gap insulators,and on a few turnouts replaced the throwbar. Alot of extra work for turnouts I chose to use in hidden staging track yards to speed layout construction!!
Ed Rappe
The layout makes the 2500 SF at our club seem at lot more acheiveable.

In a room that is admittedly not completely climate controlled, I am surpised at the amount of stick lumber used versus exterior plywood ripped to size. I hope the change of season expansion-contraction with all those sticks does not become a problem for them.
Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×