Skip to main content

Folks,

We patiently wait for the opportunity to insert smaller runs of these locomotives when the factory has a GAP in production. That GAP has materialized so we are quickly planning to make both the E7 (3.0) and ALCO PA / PB 2nd Run diesels prior to our F3 production. We think these will be ready for delivery in late Summer.

For those that already have their reservations in, you will be receiving a confirmation of your order by email in a few days. If you want to get in on these diesels you can simply go to our web site and fill out the on-line reservation form.

If your concerned about too many items you reserved coming in too quickly, just ask for a layaway plan. We can hold your models while you make payments on your order at a reasonable pace.

Not all paint schemes will make the cut, but with any added orders, chances are better that they will.

For those with T&P and MOPAC E7s on order, we will have an answer shortly as to whether we can make the Porthole version or not.

Click below to reserve these or any other great 3rd Rail products.

Reservation cut off happens quickly when parts have been ordered. So don't delay.

http://www.3rdrail.com/reservation.htm

Thank You,

Scott Mann - China

 

Original Post

Replies sorted oldest to newest

Glad your on board.

We will take orders until 5.6, that's the cut off. After that we will produce only what we have reservations for.

It turns out the T&P and Mopac E7s are not doable with portholes. So we have notified those with those reservations of the situation.

Went to the website but clicking on PA/PB image brings you to the order form - not model specifics.  Is there a page that provides the model specifics/details?  Need a refresher on what powers these things (1 or 2 motors (what kind?) per unit?  Are both A and B units powered?  Operated by Legacy control?  Features (e.g. illuminated interior? smoke effects? crew talk? Etc. Etc.).  Also, didn't see either Aspen (mostly silver paint) or Santa Fe (red/yellow) schemes as order options - am I misreading the options?  Thanks, Peter

   

There are just 2 days left before reservations close on the E7 (3.0) and PA/PB rerun. Get your reservations in, we won't be able to take them after Monday.

The road specific detail on the PA/PB was removed when we thought this wasn't going to happen. But now it is going to happen so just email me your questions directly.

Thank You,

Scott Mann

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×