Skip to main content

JD2035RR posted:
Namvet4 posted:

Will take my time and digest it all and follow through.

 

I probably omitted the most simple solution - which is run the Lionchief set and your postwar equipment on completely separate track configurations with no crossover between the two. . . .

I am thinking that you could have the interior figure 8/loop for the Lionchief and have a separate outer loop for postwar.  Let the grandkid try his hand at both control systems, throw in an accessory or two or three, and you guys will have a ball.

JD

Thanks JD for the guidance. I am leaning towards beginning with a LionChief starter set for the holidays and working my way up in the new year. That will give the Grandson something to start with right away while I play catch up and learn all about this "new age O gauge". 

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×