Skip to main content

Hello everyone!   Set up in our new house in CT.  Pictures below show the 6.5' x 8' footprint I have to work with in our unfinished basement for this year's Christmas layout.  I need to tear this down into a 4'x8' storage location when I am not working on it as this space doubles as a play area and work out area. 

I'm looking for simple track plan suggestions for this footprint.  I don't plan to go vertical this year and need to leave space for trees, houses, etc.  I have 2 manual switches (1 RH/1 LH), a 90 degree intersection, an acute/oblique angle X-intersection, and a log/mail/etc. dump along with the track pictured in the previous layout picture from MD.

 

IMG_0823IMG_0824

NOTE: not all slats inserted.  Test of strength of gap only as proof of conept before tear down.

IMG_0825

What I did last year:

2016 layout 22016 layout

Attachments

Images (5)
  • IMG_0823
  • IMG_0824
  • IMG_0825
  • 2016 layout 2
  • 2016 layout
Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×