Skip to main content

From a forum discussion, adding buildings and terrain.   Two train operation using the passing track with short trains.  Has two routes: the around the perimeter "L", and the bent figure-8 through the crossing.   It has two reversing loops, which allows reversing trains in either direction.  

Switching possibilities, with numerous industries, room to store a number of cars, and the passing track can serves as a run-around for switching and assembling trains.   Includes Mendard's lighted and detailed buildings.

M310L-01_V1f

Attachments

Images (1)
  • M310L-01_V1f
Last edited by Ken-Oscale
Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×