Skip to main content

G'morning!  The laying of the "Golden Spike" on my layout will be closing a walk- through with an Atlas single track truss bridge. I am using Ross track. The mating pins included in the bridge kit are very fragile and okay if you never plan on moving the bridge once installed....so I've ruled out using the pins.  Most of the time I'll probably duck under it BUT how can I arrange to have the track reliably line up when the bridge is replaced after I have removed it. Powering it up will be easy but I can foresee a world of nasty derailments in my future If I can't get rails lined up and stable.

Original Post

Replies sorted oldest to newest

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×