Skip to main content

"Switches in the new Silver Line rail yard do not line up with the tracks they are supposed to connect to, systems to detect train locations in the yard have failed, and there are still problems with the rocks that support the tracks, a new report to the Metropolitan Washington Airports Authority Board said."

full story at WTOP.com

Last edited by Farmer_Bill
Original Post

Replies sorted oldest to newest

"There are also long-running problems with the ballast — the rocks that support the tracks in the yard — since it was not washed properly before installation, and now fails to properly drain water during storms."

Alright then. So instead of ballast the contractor used some kind of aggregate (with fines in it). That is egregious disregard of railroad civil engineering practices. They're gonna' need a new contractor.

Lew

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×