I recommend a layer of 1-inch thick extruded pink foam glued to the top of the plywood. This allows you to introduce terrain contours lower than the level of the track, which is realistic. In the real world, is there never any terrain beneath the level of the track? For more realism, you could stack pink foam in several layers or use thicker pieces, as I have done on my layout. The track sits on several layers of pink foam and is five inches above the level of the water in the creek. The hill is also made from layers of pink foam but is entirely above track level and can simply be lifted off the layout if necessary. There is an access door for track cleaning behind the Ophir Depot (atop the hill) although I also do that partially from either end of the tunnel.

MELGAR

MELGAR_2019_0322_24_NORTH_END_6E

Attachments

Images (1)
  • MELGAR_2019_0322_24_NORTH_END_6E
Last edited by MELGAR
@MELGAR posted:

I recommend a layer of 1-inch thick extruded pink foam glued to the top of the plywood. This allows you to introduce terrain contours lower than the level of the track, which is realistic. In the real world, is there never any terrain beneath the level of the track? For more realism, you could stack pink foam in several layers or use thicker pieces, as I have done on my layout. The track sits on several layers of pink foam and is five inches above the level of the water in the creek. The hill is also made from pink foam but is entirely above track level.

MELGAR

MELGAR_2019_0322_24_NORTH_END_6E

Melgar - how did you attach the track to the foam?
Joe

@jhend1000 posted:

Hi all, 

I have a quick question regarding benchwork: 

When the actual benchwork is finished, is the homasote typically applied directly on top of the benchwork, or is plywood used as a layer beneath the homasote? 

 

Best,

Jacob 

Jacob - If you plan on using homasote (it is good for sound proofing, takes screws, paint and glue), and you plan on getting on top of the layout for any reason you need a plywood under the homasote. The homasote will not support your weight. If you screw the plywood to the bench work then screw the homasote to the plywood you should be okay as far as warp is concerned. Using the pink foam is another good idea which I did for elevated track but I had to glue the track down to the foam which is kind of permanent.  I just asked Melgar how he attaches his track to foam.
I am moving soon so will be building a new layout. I want to place a river in the back of the layout so am contemplating building that section of the bench work 4 inches lower than the rest of the bench work. I will cover that section in plywood then build up foam contoured to the river design so it is even with the rest of the bench work. In this section I plan on gluing the track down unless Melgar has a better solution. The remainder of the layout will be plywood / homasote.
Joe

Sorry, I didn't see the question until a while after it was posted.

I use cork roadbed beneath the track. In this case, I attached it to the pink foam with a mixture of a bit of two-part epoxy with mostly Titebond II Carpenters Wood Glue (available at HD). I mark the track center line onto the foam as accurately as possible and then use weights to hold the cork in position for a day or so until the glue dries. The bond between the cork and the pink foam is very strong. I also use Atlas O track screws. It seems that the cork holds them quite well without any type of glue.

MELGAR

Last edited by MELGAR

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×