Skip to main content

Replies sorted oldest to newest

I think bridges are the most compelling structures on a model railroad. My under-construction 10X5 railroad has two scratch-built bridges - a truss bridge and a trestle. The first photo shows the truss bridge as installed in 2014 and the second is a current view with the layout now about 70% complete. Truss bridge is 24 inches in length.

MELGAR_1_2014_1204_PHASE1_21MELGAR_2_WEAVER_B&M_280_2403_10

The third photo shows the trestle at the front of the layout. Trestle is 24 inches in length.

MELGAR_3_TRESTLE_RIVER_OGR_2017_0114

The fourth photo shows two truss bridges on my 12X8 layout that was completed in 2005 on the other side of the basement. These bridges were built from kits by Miami Valley Products. Although not clearly visible in the photo, there is a two-span girder bridge (with boxcars on it) between the two truss bridges. Truss bridges are 36 inches in length. The scratch-built bridges on the new layout are made from basswood. The two truss bridges on the older layout were made from spruce wood in the MVP kits.

MELGAR_4_2014_1124_06_BRIDGE

MELGAR

Attachments

Images (4)
  • MELGAR_1_2014_1204_PHASE1_21
  • MELGAR_2_WEAVER_B&M_280_2403_10
  • MELGAR_3_TRESTLE_RIVER_OGR_2017_0114
  • MELGAR_4_2014_1124_06_BRIDGE
Last edited by MELGAR

Here are some pics of the bridges on my layout. The scene by the window is more finished than you see in the pic. I guess I should take some pictures of that. Also the Lionel Bridge span going over the yard has been replaced by the mammoth triple bridge you see in several of the pics. 

Here is a link to my YouTube page to see trains running through the new bridge. You can also check out my other train vids for the progress of the layout.

https://www.youtube.com/watch?v=hd5HOydl8G8

Attachments

Images (9)
  • New Bridgie #1
  • New Bridge #2
  • New Bridge #3
  • New Bridge #4 (inside)
  • New Bridge #5
  • Bridges over Gorge
  • Draw Bridge
  • Bridge Scene
  • Old Bridge

The first photo reveals my favorite viewing location where several bridges cross a deep canyon.                                                                               The second photo shows my Atlas/Erector lift bridge which connects the main layout to an 18 foot long three yard staging area.10 05 15079

10 05 15042

TJ

 

 

 

                                               

 

Attachments

Images (2)
  • 10 05 15079
  • 10 05 15042
Last edited by TonkaNut

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×