Skip to main content

It's snowing today. My layout is in a remote building. I'm not inclined to go out in the snow, so I decided to start a thread on my layout. After years of planning and procrastinating, I'm finally making progress.

The beginning 2016

IMG_0056IMG_0057IMG_0058

2020

IMG_0591IMG_0593IMG_0596IMG_0597IMG_0607

The plan

Atlas12bV1

Attachments

Images (9)
  • IMG_0056
  • IMG_0057
  • IMG_0058
  • IMG_0591
  • IMG_0593
  • IMG_0596
  • IMG_0597
  • IMG_0607
  • Atlas12bV1
Last edited by Oman
Original Post

Replies sorted oldest to newest

Keith, yes it was snowing here this morning, but looks like it quit. 

As I saw on another topic, the benchwork looks absolutely great!! 

Would you tell me what the gaps in the outer layer of Woodland Scenics inclines are for in the third and fourth 2020 photographs? 

Also, what is the board you have placed on top of the Woodland Scenics? 

Do you plan to screw track directly to it or install another type roadbed?

Also, is that GarGraves track I see stacked up?

Neat plan!  What are the overall dimensions?

Sorry for so many questions, but I guess you can tell I am definitely interested.   

Mark

Thanks for your interest.

Bench-work is Model Railroad Benchwork

Like horses on a racetrack or cars on the freeway, the ones on the outside of a curve have a longer distance to travel. My inclines and risers are WS two wide. It's not an issue with the risers, but the inner and outer inclines need to rise at the same rate. I tried stretching the outer inclines, but that was only practical for the starter (thinnest incline). Hence the gaps.

On top of the inclines is 1/4" (.210) plywood. I did this to have something to screw the track to and provide a flexible sub-roadbed for the transition from incline to flat. I set back the start and end of inclines to provide the transition sections. I'm trying WS foam putty to build up the transition sections.

I have rolls of black foam O gauge roadbed that will go over the plywood. I bought it on eBay.

The track is Atlas O. I bought a bunch of flex track, but then learned from the forum how difficult it is to work with. I reworked the Y in my plan until I managed to build it entirely with sectional track.

The layout is 18' long by 8' wide with an additional 30" to the width at the east end.

I'm also OCD  I think it's obvious from how I'm building my layout. Also, as a product development engineer for 30 years, I was expected to have a plan that would work from the drawing board, not from tweaking it in the lab. Minor adjustments allowed, but not major ones.

A little more detail on the incline transitions. My grades rise 3/4" in 24". The elevation change is 6". The last section of the incline is 4"+ 1/2" + 3/4" risers stacked plus a 3% WS starter. That brings me to 6". But, I cut off the last 8" of the starter and moved it ahead 8" to create a transition. So, now I have a 16" section that needs to rise 1/4". This is half of the 3% grade.

@Oman posted:

Mark

Thanks for your interest.

Bench-work is Model Railroad Benchwork  They do such a nice job on the curves, not to mention the rest of the benchwork.

Like horses on a racetrack or cars on the freeway, the ones on the outside of a curve have a longer distance to travel. My inclines and risers are WS two wide. It's not an issue with the risers, but the inner and outer inclines need to rise at the same rate. I tried stretching the outer inclines, but that was only practical for the starter (thinnest incline). Hence the gaps.   Duhh!  I should have figured that one out myself!!  Makes perfect sense.

On top of the inclines is 1/4" (.210) plywood. I did this to have something to screw the track to and provide a flexible sub-roadbed for the transition from incline to flat. I set back the start and end of inclines to provide the transition sections. I'm trying WS foam putty to build up the transition sections.  Sounds great for attaching the track and transitions.

I have rolls of black foam O gauge roadbed that will go over the plywood. I bought it on eBay.  I have never tried foam.  Once I use up my stock of cork, I may give foam a try.

The track is Atlas O. I bought a bunch of flex track, but then learned from the forum how difficult it is to work with. I reworked the Y in my plan until I managed to build it entirely with sectional track.  Atlas track looks great!  When I started buying track, there was a shortage on Atlas track, so being fairly new to O gauge (after 40 years in smaller scales) I was afraid I would have trouble getting what I needed, so I went with GarGraves and Ross switches.  Yes, GarGraves flex is so stiff too.  I am using sectional.

The layout is 18' long by 8' wide with an additional 30" to the width at the east end.  That will make for a nice long run.  

I'm also OCD  I think it's obvious from how I'm building my layout. Also, as a product development engineer for 30 years, I was expected to have a plan that would work from the drawing board, not from tweaking it in the lab. Minor adjustments allowed, but not major ones.

Keith, Thank you for all the answers and the curve diameters in the second post.  I'll interject my comments above in red.

@Oman posted:

A little more detail on the incline transitions. My grades rise 3/4" in 24". The elevation change is 6". The last section of the incline is 4"+ 1/2" + 3/4" risers stacked plus a 3% WS starter. That brings me to 6". But, I cut off the last 8" of the starter and moved it ahead 8" to create a transition. So, now I have a 16" section that needs to rise 1/4". This is half of the 3% grade.

Excellent idea!!  I would have liked to transition to my 4% grade more, but in an 11x11 room, I just didn't have the space to do it.  The longer route that is 3% has a longer transition at the bottom end and I will at the top too.

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×