Skip to main content

Replies sorted oldest to newest

I made what I call a DRAW BAR / TETHER BOARD. Not only are the draw bars difficult to connect, but so are the A-B-A units tethers. It's a piece of 3/16" MDF that measures 3.25" x 42", with 1/4" self adhesive dense foam applied. The 42" length is a must for Premier A-B-A E8's. You place the board along side the tracks, lay your engine and tender on the board and make your connection, then simply roll the combination right onto the rails. With a little practice you can get all the units wheels to land perfect onto the rails all at once.

Tether Board 1 Tether Board 2 Tether Board 4

 

Attachments

Images (3)
  • Tether Board 1
  • Tether Board 2
  • Tether Board 4

Add Reply

Post
This forum is sponsored by MTH Electric Trains

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×