Skip to main content

Let me preface this by saying that I have the SCARM software but don’t understand how to fully utilize it.

I am looking to build an elevated double line layout with switching between the two.  I will isolate appropriately and power each line with one half of a KW so that I can run 2 trains independently.  I want to use Lionel or Menards O (not O27) due to budget and local availability.  If only one line extends over the L section, I am fine with that.  I am also not opposed to using 90 degrees crossovers if necessary.  I also don’t know which track to use (31, 36, etc) to keep corners neatly together like the straightaway sections.

Attached is a picture with the rough dimensions of my layout.  The 4’ x 1’ yellow section is my control bridge and I would prefer not to go over that area.

Any help would be greatly appreciated!

Attachments

Images (1)
  • B47C6689-6BEC-4106-9803-E1AE4793AB13
Original Post

Replies sorted oldest to newest

If you use O36, you can get an O27 loop inside.  You will have to do a little "adjustment" to mate up the switches, but that's something that's been done before.  For O36, you'd probably be using Fastrack as I don't know of any tubular track of that size.  For the outside loop, by the time the roadbed is considered, you need around 39" in width, and that's with the track right to the edge, so you probably would want a bit more space.

Attachments

Images (1)
  • mceclip0

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×