* * * UPDATE * * * *

Completed the lower level of storage tracks; started the upper level.

 

 

Note that the screw holes in the ties are neatly centered using my centering drill-guide.

 

 

I was thinking if this mess goes on any further, I may add three more levels just to store more engines and cars outside of the boxes for easy retrieval in a way that does not interfere with the static shelving.

* * * * * * * * *  

 

So being home I finally had the time to get into adding storage tracks in where else but my storage room that is adjacent to my layout. I am adding 10 lines in two levels about 17.5 feet long each line.

I first broke into the storage room then into the mountain and below adding two four-way switches and two "curve on curve" switches. I use the storage shelving to support part of the tracks. At the corner where the  vertical storage post was in the way I remove it and hung the shelf in a cable-stayed arraignment. 

20200328_145311_resized_1

20200328_144745_resized

20200328_144752_resized

20200328_144755_resized20200328_144812_resized20200328_144827_resized20200328_144841_resized

Once i get the bottom level tracks screwed in I will add the upper level of track. 

I made spacer pieces to aligned the straight track 3.5" on the center-lines apart This will let me store passenger cars out of the boxes and onto the layout in two levels.

Attachments

Images (12)
  • 20200328_145311_resized_1
  • mceclip0
  • mceclip1
  • mceclip2
  • mceclip3
  • mceclip4
  • 20200328_144745_resized
  • 20200328_144752_resized
  • 20200328_144755_resized
  • 20200328_144812_resized
  • 20200328_144827_resized
  • 20200328_144841_resized
Last edited by AlanRail
Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×