Hi Guys, well got a bit done this mornin then another bit this evening. Nearly have the track-bed timbers into what will be the station area in front of the kitchen/diner window..... lookin forward to the view of the trains coming and goin at the window , will make the effort all worth while ! 

DSCN4055

DSCN4056

Attachments

Photos (2)
Last edited by Davy Mac

1st pic is a view from the kitchen window..... I've almost got the curve finished into the station area... however ,right now I need to go and work... so tools downed for now !! ...Loco is a French diesel by Lima  

DSCN4061

DSCN4062

Attachments

Photos (2)

Finally round the curve and ready for the next part which will be the station area.However at this point I need to turn my attention to the rest of the garden re-build for a few days. Whole lot of demolition and moving stuff about required

DSCN4069

Attachments

Photos (1)
Last edited by Davy Mac

Looking good, but don't hurt yourself again.  Lot's of work there.  Bending all the time is very hard on our bodies if we aren't careful.

 

havr lots of fun!

Hi George, too late....I'm still fallin to bits...lol..... its an effort to get the old creakin body parts to move of a mornin these days ,they ain't kiddin when they say age doesn't come itself .... but hey ho.... upwards and onwards.... no pain no gain....

 

Hi again George what was that you were sayin about not hurtin myself again??..... ...here's todays right hand.... cut on the middle finger and a later wound where I stabbed myself with a bit of broken timber between my thumb and first finger.... lol....

DSCN4073

DSCN4074

Attachments

Photos (2)
Last edited by Davy Mac

Hi Guys, well after a couple of (painfull..ouch) boring days burning rubbish, demolishing and muck shiftin I'm back on the rail route today .As you can see I'm round the curve and onto the straight in front of the kitchen window. Hoping to squeeze a station in there but because the retaining wall narrows on that section it might be toght to get much in the way of platforms and sidings in so it may well yet just be a central simple platform between the two mianline tracks,we'll see. 

DSCN4075

Attachments

Photos (1)
Last edited by Davy Mac

This next picture hopefully kinda will give you a picture of where I'm goin with the part of the garden  forward of the kitchen window. The grassed area still in place will be lifted and that area filled with rubble then a new patio built .A new lawn the base of which you can see under construction just forward of that remaining still to be demolished bit of old wall will be forward of the patio,then where the parts of the swing seat etc., are sittin right now is where the new pond will be. Solookin out the window it will be ,trains, sun patio,lawn and a sloping pebble "beach" down into the pond with a decent sized waterfall smack centre., however a lot of work before I'm anywhere near that stage. Anyway after a crappy summer we've finally had some really nice weather the last wee while so I better get back out and get on with it !!

DSCN4077

Attachments

Photos (1)
Last edited by Davy Mac

Hi Guys,not much to report on the railway side of things but a whole load of other work has been in progress. Since I last posted I have moved my next door neighbours old front lawn turfs and soil into my back garden and have also lifted most of the small lawn I had . This material will be getting used as bottoming for the new lawns I intend to lay. All stockpiled  for now. Been filling in the old lawn area with demolition rubble from other parts of the garden and am now starting to cover this with "type1 hardcore" as we call it here. (Type of crushed rock). Once I get that complete I'll be laying a new patio. As you can see I have started to build a curve with sandstone,this isn't for trains this will be a stone built bed for plants and shrubs  running up the garden to split it into two pretty much seperate areas. The trains will go straight across to the right . Kinda hard to explain but all shall be revealed as work progresses.Anyway,thats where I'm at for now.Luckily the weather is being quite kind so things are advancing slow but steady.

DSCN4080

DSCN4081

DSCN4082

DSCN4083

Attachments

Photos (4)
Last edited by Davy Mac

Hi George, believe me am gettin sore doin it ...lol  .... 5.24 pm and have downed tools for the day,had a shower and already in my snooze pit. Dying to get trains running but I think it will will be into next spring before I get to that stage .Trying to get as much done with the landscaping  before the frosts arrive  

 

Last edited by Davy Mac

Ran out of sand and cement today ,more coming tomorrow. Made a bit of progress on the straight station section. Re-cycling demolition brick etc. Old lawn now completely removed too. 

DSCN4084

DSCN4085

Attachments

Photos (2)

Oh well.., decided to have a go at demolishing the old formation before I had my dinner.... got horsed into it with the big hammer and the pinch,once I got a start made it broke up quite nicely ,managed to salvage a lot of the sandstone too. So thats all for today....

DSCN4086

DSCN4087

Attachments

Photos (2)

Just had to post these two next pictures my wife took..... sun was blindin hence the screwed up face , but they came out like I'm a maniac with murder on ma mind.... had a good laugh at them....

DSCN4088

DSCN4089

Attachments

Photos (2)

Hi Guys a bit more progress, in these pics., the long straight secion along the house is almost up to height to take the track-bed. The other sandstone work will come up to the same height and will be a flower/shrub bed and will be the front part of the shrub bed which will divid the garden in two from front to rear. Kinda hard to explain but ,you'll get the picture as the work progresses....

DSCN4100

DSCN4101

DSCN4102

Attachments

Photos (3)

Hi Guys, been busy with other things the last coupleof days but got a bit more track-bed done.Had to form a slew to get the track alignment central on the next section, this will let me get two passing loops along the next section on the straight. 

DSCN4104

Attachments

Photos (1)
Last edited by Davy Mac

Another wee bit progress.... rain stopped play though !!,gettin to that time of the year. Just hopin the frost stays away for a few weeks yet !..

DSCN4105

Attachments

Photos (1)

A bit more progress. Some wet weather and earning a living have got in the way of progress a bit the lastf ew days however still advancing. Where the new concrete block ends will be the new access to the whole garden so a lifting section of track will be require to bridge the gap as and when. As you can see the track base timbers are widened to take a double track main with passing loops .

DSCN4106

DSCN4107

Attachments

Photos (2)

Great weather today ,got on quite well. Got all the timbers in for the passing loop section. Thats the track-bed build up to where the new access to the garden will be.

DSCN4108

DSCN4109

DSCN4110

Attachments

Photos (3)

Hey Davy,

Do you have a basic track plan in mind? Looks good! I need a cold drink just looking at your heavy duty landscaping and lifting!

George

Last edited by Seacoast

Hi George, no track plan per se other than the intention to lay a double track main all the way round.I had intended to put a station where the passing loops are but space dictated otherwise. However theres another couple of potential locations for stations. I got on well today with some stonebuilding work but never got photos. I'll post some tomorrow. We're now having  superb weather here and its to last a while so I'll keep pushing on as much as possible before it breaks. 

 

Last edited by Davy Mac

Hi Guys, working on the planter/garden divide today and yesterday. Not quite finished. The big boulders in the middle are resting on old blocks and rubble. Doesn't look all that impressive at the moment but once its filled with soil planted out and dressed it should look the part. I intend to plant thyme and the like adjacent to the rail tracks but on the other sides trailing plants. End of this season so it will be next year before the finished effect is seen.

DSCN4111

DSCN4112

DSCN4113

DSCN4114

Attachments

Photos (4)
Last edited by Davy Mac

Hi GUys well,amazing beautifull weather here,can't believe its October.Anyway,put in a great shift today about 10AM till now 7.45PM. Got a huge chucnk of patio laid and the planter-cum-garden divider section filled with soil and topped off with ornamental fine gravel. It can sit like this till next planting season apart from some Narcissus and crocus bulbs I'll probably put in next week. We'll see. Anyway,I'm goosed,so I'll let the pictures do the talkin. These are my old reclaimed paving slabs Ive used,incidentally laid in a bed of about 2" to 3"wet cement.  I'll hit them with some chemical cleaner and the powerwasher and they should come up fine. Still a bit to go with the patio but at least thats a decent start.

DSCN4115

DSCN4116

DSCN4117

DSCN4118

DSCN4119

DSCN4120

DSCN4121

Attachments

Photos (7)

wee bit more slabbing progress this morning... however now I need to go and make a living for the rest iof the afternoon ....

DSCN4122

Attachments

Photos (1)

Hi Guys, well sods law, just as I get round to laying some track we get the first rain for weeks ! Never mind its a start...

DSCN4125

DSCN4126

Attachments

Photos (2)

Just waiting for the rain to stop !!.... got a bit more track laid yesterday . I love the realistic look that can be achieved using flexi track. Oh well, hope the rain abates sooner than later

 

DSCN4127

DSCN4129

Attachments

Photos (2)

Hi George, its been excellent here most of September ,tomorrow is supposed to be a lot better. Just workin between showers right now. Track laying is advancing slow but sure !

OK , heres the first loco test. No great Hollywood production ... but at least the track wiring is working.

Attachments

Videos (1)
DSCN4132

Rain again today but got some ornamental chips laid round whats laid of the patio so far, ..... raining heavy now .so thats all for now folks 

DSCN4134

DSCN4135

Attachments

Photos (2)
Davy,
Do you attach the track to those boards and or does it float on top of the Stonework ? Do you use ballast?

George

Last edited by Seacoast

Hi George,yip,track is pinned to the timbers and levelled as much as possible .loose ballast is then spread over the lot and brushed into place. In some places where the timbers have settled uneven in the cement you can get dips and tilts. the fixing pins in such cases don't need to be hammered all the way home ,just enough to hold the track in position and any dips or unevenness under the track can be  packed to level with the ballast ,pretty much as per the real thing. supposed to be dry tomorrow. I'll post pics of exactly how I go about laying the track for you.

  

 

Last edited by Davy Mac

Dave, this whole thread has been a joy to follow, I tip my hat to you mate, not only the hard work you've been doing but your skill and planning is brilliant. 

 

I will join you with a single on your completion  by the rate you are going in the not to distant future.

 

cheers and thanks for sharing.

Cheers Airedale, just keepin my fingers crossed that rain and hard frost stay away for a few weeks yet. I'm making progress but still a helluva work to be done yet,..... however every bit I get done now is a bit less come the spring,hoping to at least have the bulk of the landscaping's back broken by then....if it doesn't break mine first .... ha ha. The moral support is appreciated 

 

Davy, Great work on a one of a kind layout. I like your method of planning in your head and building as you go. I was born and raised here in the U.S. but my family originated in Orkney. My clan name is Sinclair. I must ask what part of Scotland are you from?

Thomas

hi thomas, thanks for the thumbs up. I live in the central belt just oustside Glasgow, however my ancestry is from all corners of Scotland ,Highland and Lowland alike..... a son of many clans 

 

Hi Guys, well ,almost finished the right hand curve build. This will be the tightest curve on the whole layout . There will be a lifting section across the gap in the second photo ,thats the main entrance to the garden. A lifting bridge would be nice but don't know if my engineering skills are precise enough....we'll see !. 

DSCN4142

DSCN4143

Attachments

Photos (2)

Add Reply

Post
OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
330-757-3020

www.ogaugerr.com
×
×
×
×
Link copied to your clipboard.
×
×