Skip to main content

Jan 8 St Joseph Yard Test - with the goal of having the lower level ready for visitors in time for the LOTS convention in Lawrence KS, the team is laying track fast and furious.  I posted this pic in the ‘what did you do on your layout’ thread also.  Just a fun pic.

IMG_1200

Video is test of the Yard 1 track out to the main yard entrance.  First test had significant (2mm?) transition within the Gargraves switch.  Added some track pins and now it’s pretty smooth.  Photo of track pin.

image

Attachments

Images (2)
  • image
  • IMG_1200
Videos (1)
IMG_1202

Full Disclosure - I make a mess when I work.  Multiple mini projects in various stages - Grand River valley along the wall, Lionel truss bridges being modified to accept Gargraves track, overall view of lower level peninsula with cardboard simulating visual divide.

2nd photo - yard track painted and ready for ballast, incline/decline out of Marceline still taking shape

last photo - Disneyland - Marceline wiring needs finishing, latest iteration of monorail just clamped in place.

IMG_1266IMG_1267IMG_1269

This is the real deal - progress and chaos and visualization at the same time!

Attachments

Images (3)
  • IMG_1266
  • IMG_1267
  • IMG_1269

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×