Skip to main content

Hello!

     I'm finally in the construction phase of my 8'x24.5' layout using Atlas O 3 rail track, and after going over countless ideas for some industries I just can't decide on something im going to be happy with permanently.  In the picture you'll see a big open area in the middle of the tabe and i want to fill that with 3 industries (oil, rock, and sugar). Thoughts and ideas of any kind would be greatly appreciated!

disregard the switches that are already in that area lol.

Attachments

Images (1)
  • RCRX
Original Post

Replies sorted oldest to newest

To me, your track plan is quite elaborate.  Is the layout viewable from all sides ?   As far as industries in the open area, you're already off to a good start with the switch tracks I'm supposed to disregard.....LOL

Those three turnouts are in ideal locations to serve three industries.  I really think you hit on something good.

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×