Skip to main content

I have the one from a few years back...non TMCC Lionel Lines.  Had to replace the beam.  Trying to reach assemble but I cannot figure out how the tension Springs inside of the conveyer culvert hook go when you put the piece back on the rail.  This is the piece that actually picks up the culverts.  There are two tension Springs on either side of it.  The unit won't close on the culverts unless this is mounted correctly.  Can someone please guide me....pictures would be oh so helpful.  Going nuts trying to figure this out.  BigRail

Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×