My personal opinion is that a consensus is never possible.    A compromise is possible in a lot of cases.

The other side of this is that I don't secure buildings to the layout in most cases.    If they are permanently secured they sometimes get in the way of maintenance and cleaning.   

Instead I locate them in place so they can't move sideways with pins.    I generally use small 3/4 inch long nails and usually clip the heads off.    Most buildings have open bottoms or some sort of opening.    I figure out where I want to locate the building and mark at least two corners.    I then measure from the these corners to the opening inside the building.    I then locate the nails underneath on the layout where the opening in the bottom of the building will be.     Then I can place the building on the layout on the locating pins.    I can scenic around the building and still be able to lift it off if needed.

You can use the same technique with a permanent foundation, just use longer pins so they are above the height of the foundation.    You make the foundation permanent but leave the building removable.

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×