Skip to main content

Replies sorted oldest to newest

Well, using the Legacy controller to build a route alone on by adding sub-routes, the is a limit of 16 total sub-routes and switches.

It would seem that after sixteen switch executions one could start a new route with sixteen more as a work-around.

Finally are you speaking of the LCS software as the LSU is for legacy system maintenance?

I am referencing page 71 of version 1.6 of the Legacy User's Guide and version 1.0 for the Legacy System Utility software.

I don't have any LCS devices.

16 is the limit for number of switches for a Rte. 

@Moonman posted:

Well, using the Legacy controller to build a route alone on by adding sub-routes, the is a limit of 16 total sub-routes and switches.

It would seem that after sixteen switch executions one could start a new route with sixteen more as a work-around.

Finally are you speaking of the LCS software as the LSU is for legacy system maintenance?

I am referencing page 71 of version 1.6 of the Legacy User's Guide and version 1.0 for the Legacy System Utility software.

I don't have any LCS devices.

Yes, I realize that I could use additional Rte to include all the switches I wanted to align for continuous running. I was just hoping someone had a more eloquent solution.

No I am referring to LSU, Legacy System Utility, where you can maintain the Control Base Database including engines, trains, acc, etc. 

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×