Skip to main content

Replies sorted oldest to newest

"How's it work with TMCC/Legacy?"

Metal bridges must be insulated from tubular track ties.  I use a layer of grey indoor/outdoor carpet under the track.  If track must be secured to the bridge, 3mm black nylon screws (from the river site) work great.  Some of the time, the TMCC "ground plane" signal gets through the open trusses.  If there's problem with signal reception within the bridge remains, then connect the metal bridge to the ground plane (as discussed on other threads).

@Former Member posted:

They shouldn’t be too hard to find.  I stumbled across a Rock Island one at a local antique shop the other day and bought it.  I was going to hit it with some silver paint, but changed my mind.  The rust gives it a good patina.

DD0FE442-2980-4B5D-9867-8CB45CC70553

is, that, an, Autocarrier? and AND a bridge? oh be still my heart. very nice nice indeed! Now to write out a check from my train purchasing fund to repair a WaTeRLeaK. (such a waste of good train funds.)

Beauty, thanks for the share. Marx Metal Bridge!!

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×