The pics below show what I have been up to.  Mainly the three sidings that will be next to a small town area.  This is not in the original plan.  However, I think this work better than cramming the entire area with track and still gives some of the same functionality.

Note that I decided to use manual throws for the turnouts here.  This was done to save as much space as possible for a road over the “main line” tracks and into the town.  Plus I figure that this will make moving cars in and out a bit more interactive.

 IMG_20191027_182808IMG_20191027_182836IMG_20191027_182852IMG_20191027_183020

Next I plan to weather and ballast the sidings and start the area below.  I am still trying to decide how to shape this corner and blend the terrain with the building (Carter’s Lego Factory) and the wall. 

IMG_20191027_183156

Thanks for looking, 

Chris

Attachments

Images (5)
  • IMG_20191027_182808
  • IMG_20191027_182836
  • IMG_20191027_182852
  • IMG_20191027_183020
  • IMG_20191027_183156

Latest update pictures attached. I have decided to focus on scenery on an empty corner of the layout. Many things were learned here! Basically, I followed the methods shown in Eric Siegel's videos. I would change a few things next time but overall I am really liking the results. The pics below show the progress. It is pretty much complete with the exception of more plant life and debris.

IMG_20200101_150339IMG_20200101_165830IMG_20200331_072525IMG_20200331_072544IMG_20200407_094030IMG_20200410_134641IMG_20200410_134705IMG_20200411_210822IMG_20200411_210837IMG_20200411_210859IMG_20200412_125425IMG_20200526_114818IMG_20200526_114832

Next, I am planning to continue track ballasting and begin fascia installation.

Thanks for looking,

Chris

Attachments

Images (13)
  • IMG_20200101_150339
  • IMG_20200101_165830
  • IMG_20200331_072525
  • IMG_20200331_072544
  • IMG_20200407_094030
  • IMG_20200410_134641
  • IMG_20200410_134705
  • IMG_20200411_210822
  • IMG_20200411_210837
  • IMG_20200411_210859
  • IMG_20200412_125425
  • IMG_20200526_114818
  • IMG_20200526_114832

One goal achieved ahead of the deadline! The "town" buildings are in place and lit. Street markings are also in place. Originally, I intended to weather all the buildings. I may come back to that at some point, but for now I want to make progress.

IMG_20201218_091135IMG_20201218_091213IMG_20201218_091222

It looks like the Christmas train has arrived!

IMG_20201218_091307IMG_20201218_091324

Below is a picture of some remote controlled outlets. These things are working great for powering the layout. I did not want to run wire back to the control panel to power lights. Especially because I intend to have a combination of AC and DC (LED) lights in the future. The remote outlets allow me to power from wall outlets under layout that are closer to the actual location of the lights / devices. The remote outlets that I chose come in a set of five with two remotes. Each outlet can be toggled on and off individually. Science!



IMG_20201218_091536

Thanks for looking,

Chris

Attachments

Images (6)
  • IMG_20201218_091135
  • IMG_20201218_091213
  • IMG_20201218_091222
  • IMG_20201218_091307
  • IMG_20201218_091324
  • IMG_20201218_091536

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×