Skip to main content

Hi everyone.

Thank you all for following this post and all the nice compliments.

Steve,

I work in this industry and have been to many oil terminals and refineries.

Here are a few pictures of the completed piping in the rack, the PGO tank in its concrete containment area, and the piping leading to the truck loading rack area. I will start building the furnace, distillation tower, flare and control building.

 

Alan Graziano100_4164100_4165100_4166

Attachments

Images (3)
  • 100_4164
  • 100_4165
  • 100_4166

Myles,

I make cones by calculating the diameters and the amount I have to remove in degrees. I will cut them out of .010 to .020" styrene or abs. I will either lap the joint or add a backing strip and butt the seam on the cone.

If I were you, I would come up with my own design and make what you want rather than being limited by the kit. The plastruct refinery kit is actually based on a chemical facility rather than a refinery for oil.

 

Alan Graziano

Alan, I'm kind of coming in late (2-3 yrs later) in seeing the refinery. Wow is it EVER nice, especially the night shot. What is the overall footprint? What is the 455-derrick-like tower in the corner - is that part of a refinery, or just a derrick tower?  What is the rough total of man-hours into building one of those? Can any one without super-deep pockets afford one (that is, IF you custom-build for others) ?  REALLY love your work !

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×