Skip to main content

I just replaced 2 end to end switches which have been working as a poor substitute for a Double Crossover.  I now have a Ross Double Crossover and an going to run it with 4 DZ-2500 switch machines.

My question is, can someone tell me how to wire this to do the job?.  I looked at Z-Stuff and Ross website for direction.  Close but a little vague.

I am not using the DZ-1008 for the diamond, as I do not have power disruptions in my locomotives.  All are Premier of Legacy.  Some 3rd Rail which work fine also.

Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×