Skip to main content

Replies sorted oldest to newest

I'm sorry to have taken so long to respond, but I just finished wiring my 32" by 66" On30 layout.  Two years in the making.  I still have roads, a bridge, some coal chutes, & some green scenery to finish.  I hope in a few months I will be ready to post some photos of my progress & finished work.
To answer the question, this is what I have.  PECO track and switches that are Streamline, 4 left, 2 right, & 2 "Y" (I have a 50/50 amount of solid & insulated frogs.  The solids were all I could get while I was building.).  Spectrum locos are 0-4-0 Porter steam loco, 0-4-2, Porter steam loco, 4-4-0 Modern American steam loco, and a Railbus & Trailer.  I have absolutely no issues going through any switches.  I have several pieces of freight rolling stock that do not have any issues either. I want to make a note here that I do not loop & change the direction of travel, so I do not need to ever change polarity except to reverse.  I also have 11 switches controlling power to different sections of track.  I like PECO track.
The Railbus with its 3inch spacing between large wheels does require "perfect" level track of which I thought I had , but it does fine through the switches.  I've looked at the contacts on the Railbus & I think I will check the tension on the contacts to the wheels when I get some time.
I hope this bit of info was of some help.
Dennis

Last edited by Hartman

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×