Skip to main content

Darrell, et al, how do I get this plan of Darrell's into my software?  I tried the 'ole click n drag but it only brought in a PDF picture.  I cannot modify or continue to work it.   I think I'm leaning here to this one, but deleting the extra turnaround in the middle and going over it to be sure everything is 072 or larger with 6" spacing from walls and other track so I can run ANY big boy type engine I'm crazy enough to buy.   THX!

Attachments

Images (1)
  • mceclip0

Great.  Sent in my track plan that Darrell helped me with to Steve at Ross.   He's going to get back with me, and we will see where I go from there.   Thank you Darrell and the other folks who got me to this point.  Once I get this track plan finalized/tweaked etc.   I'll jump over to the electrical section.   I don't understand squat on wiring and powering all this, so that's the next challenge.   THX!!!  I'll post a more as this progresses.  I have enjoyed reading on here and watching others develop and build, so I guess someone might enjoy watching my progress over the next months/years too.  

This basically where I ended up at just shy of 15' wide and just shy of 17' long.  I sent it to Steve at Ross and I'm sure I'll use his switches, just decided on track either Ross, Gargraves, or (GASP) menards tubular with the ross switches.  I'm also trying to figure out power and control on one of the other pages here.  I'll get there, you guys have been a great help.   MIGHT make a tweak or two IF I come up with something interesting to add, but not quite sure.  I've got a couple wacko ideas to create some elevation changes, but we'll see.  As long as it works with my table as seen on previous page.   Thx.

Attachments

Images (1)
  • mceclip0
Last edited by Hp289

And in the spirit of sharing, the room had 8 new LED lighting discs installed this week.  The painter started on Friday and should finish painting this room by Monday or Tuesday.  I'll be at a standstill for a couple of weeks after that since the new carpet doesn't go in until the 31st.    I guessing I can build my benchwork thought September over a couple of weekends since it's not a complicated plan.  Feeling good about my progress.    

Attachments

Images (1)
  • mceclip0

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×