Skip to main content

I have never seen a Shuttlewagon until today when the Science Channel showed how they are made. They have a 600 hp diesel engine and can pull 40 cars. It has rail wheels as well as big rubber tires, so it can run off the track. Perhaps if I lived near a freight yard then I would know about these freight movers. Wonder if we'll ever see an O gauge model?

Shuttlewagon

Attachments

Images (1)
  • Shuttlewagon
Original Post

Replies sorted oldest to newest

A few shots of one we operate in California I saw on a business trip.

 

IMG_1235

IMG_1274

Rail Puller

 

These are used in place of a locomotive in industrial settings where cars need to be switched out regularly for loading and unloading between full rail pulls by the railroad. I don't think you would ever find one in a rail yard where locomotives would be present to do the work. 

Attachments

Images (3)
  • IMG_1235
  • IMG_1274
  • Rail Puller
Last edited by tackindy
Originally Posted by Hot Water:
Originally Posted by smd4:

Painted couplers? I thought that was verboten.

I seriously doubt that that thing is FRA compliant, or even under FRA jurisdiction.

Being that they never traverse mainlines they don't need to be.  They are only used on private rail spurs within company grounds.

Last edited by tackindy

Rob; during most of my career, the C1’s would shift cars around inside a plant multiple times and rarely charge for it. That changed when they began requiring all car movement’s within a plant site to be requested electronically. Crews were forbidden to move a car unless the conductor had it on his/her work order. Once they could track intraplant switch moves, the cash register started ringing.

I recollect CN being the first to start this when Hunter was there. Basically he transitioned everything the railroad had previously done as a courtesy into what I referred to as “ala carte” railroading. By the time I “pulled the pin” in mid 2019, all the Class 1’s where handling in this manner.

The cost of the intraplant switch moves aside; another factor driving rail customers to perform their own intraplant switching is simply that the railroads no longer want to mess with it. As manpower has been cut over the years, local crews have been given more industries to serve. If they burn their hours of service at one or two customers moving this car over there and that car over here, the local crew is unable to complete all their work and customers further down the line are not receiving the service they require.

Curt

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×