Skip to main content

What projects have you got done cooped up at home. I’m not tied down at home yet as I’m considered essential personnel but I did get to some things I’ve been meaning to get to. 

1. Installed LED lighting in my red bird subway cars. ✅

2. finished my garbage flat. ✅

3. Got some new “Homies” on one of my platforms. ✅

6E9BB0B1-08B5-4412-9838-5D1F178C6DD23B082D45-912F-4719-9E3A-05A8829162DB086B3FE0-1F86-4897-9F30-D255FF59CF53465B91D8-08C8-463C-90A1-6A576346E828923198D8-90DE-4533-A089-E5106116411A2D75DF6D-3F84-4FDC-A7BE-705DFA727365

Attachments

Images (6)
  • 6E9BB0B1-08B5-4412-9838-5D1F178C6DD2
  • 3B082D45-912F-4719-9E3A-05A8829162DB
  • 086B3FE0-1F86-4897-9F30-D255FF59CF53
  • 465B91D8-08C8-463C-90A1-6A576346E828
  • 923198D8-90DE-4533-A089-E5106116411A
  • 2D75DF6D-3F84-4FDC-A7BE-705DFA727365
Last edited by Chris Lonero
Original Post

Replies sorted oldest to newest

I have installed two Miller Engineering signs which have been laying around far too long, The City Light and Power sign and the Hamm's Beer sign.  I also painted and installed  River Leaf Models Hairpin Fencing around two of my baggage stations.   Also, I am in the process of  performing some routine scheduled maintenance on my "vast" roster of motive power.

I had a #6 switch laying around and couldn't remember why I bought it.  Friday I remembered...it was for a caboose track in my yard and I didn't have enough track to put it in at the time.  I ordered some Micro-Engineering track from MicroMark that day.  I've since installed the switch just waiting on the order to arrive so I can finish.

Other than that been (finally) running trains. Last time I had a session was back in August!

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×